Three colleagues in discussion at a table with a laptop

Operations & Performance

Cost, throughput, quality and service: the operation measured where the work actually happens, then redesigned with the people who do it, to a number agreed before we start.

£110–160k, fixed · quoted before we start

Four numbers before the argument.

The measure

−23%

unplanned turbine downtime, over a year

Duration

10 weeks

Embedded, on the floor, in the depot, in the queue

Fee

£110–160k

fixed, quoted before we start

Stage of the method

03

Delivery, 12 weeks of the 28

Four parts, and what each is for.

P.02.01
Process measurement

Time, touches, rework and waits, counted at the point of work, not estimated in a workshop.

P.02.02
Capacity & scheduling

Demand against capacity by hour, site and skill; the mismatch is usually the whole story.

P.02.03
Supply chain

Inventory, lead time and service level, and the trade-off between them made explicit.

P.02.04
Service operations

Queues, backlogs and handovers, redesigned so the worst-served customer is served first.

Eight steps, in this order, every time.

S.01
The measurement
six weeks on the floor, every step timed
6
S.02
The mismatch
demand against capacity by hour, site and skill
5
S.03
The redesign
written with the team leads, tested on one queue
4
S.04
The run-rate
tracked weekly, published to the board monthly
4
S.05
The waste ledger
every wait, rework and handover costed
3
S.06
The shift pattern
rosters rebuilt against the demand curve
3
S.07
The handover
the floor runs it without us for four weeks first
2
S.08
The twelve-month check
one visit, one number, published either way
1

Bars at true proportion; the counts are engagements in which the step was decisive.

What you are holding at the end.

You leave with

The operation, measured: a baseline your own team can rerun
A redesign the team leads wrote with us
A run-rate improvement, tracked weekly for a year
−23%
 unplanned turbine downtime, over a year

Buy this when

01
Cost is rising faster than volume and every team has a reason why it is another team's fault.
02
Service levels are missed in the same places every quarter.
03
A previous efficiency programme delivered its slides and none of its savings.

If none of these is true yet, the audit is the cheaper place to start.

“The schedule is argued with now, rather than followed. That is the difference between a tool the floor trusts and one it works around.”
Operations Director, Halvard Energy
Operations & Performance · outcome 
−23%
A monitor showing the time in large digits
The measured hour /
Four colleagues around a table, notebooks and a laptop open
With the crews /
A still lake under mountains, a jetty in silhouette
The network /

Where it has been bought, and what it came to.

Four colleagues around a table, notebooks and a laptop open
Energy & utilities
2024

Maintenance regime redesign at Halvard Energy

−23%
unplanned turbine downtime
Read the case 
A laptop open on a bare wooden desk
Logistics & transport
2024

Network redesign at Northline Logistics

+9.6pp
on-time delivery across the network
Read the case 
The full record /
7 cases
Every engagement is on the record, with the number it was measured against, whichever way it came out.
All cases →

The clients on the record.

Agree the number before the work starts.

The audit / four weeks
A.01
One figure, agreed in writing before any work
A.02
£45–65k, fixed, whatever the audit finds
A.03
It prices the stage after it, so nothing is bought blind